The necessary responsibility for concrete batching plant operator

The necessary responsibility for concrete batching plant operator:

Before starting the stirrer of concrete batching plant, check the clutch, brake, wire rope, etc. should be good, the barrel must not have foreign body.During the working, such as failure cannot continue to operate, shall be immediately cut off the power and the concrete within the mixing drum to clear and clean.

An experienced concrete batching plant operator will all know that the belt Conveyor in the no-load or load operation process, there to run side of the side or a while and run on the left and ran the right side of the phenomenon, causing leakage, equipment, abnormal wear and damage, reduce productivity, and will affect the whole batching plant equipment is working properly.But they can solve it easily.First, there are many factors that lead to tape deviation,Should be from the conveyor design, manufacture, installation commissioning, use and maintenance and other aspects to solve the tape deviation, such as tape on both sides of the tightness is not the same, both sides of the tape is not the same level, the roller bracket and other devices are not installed Tape running in the direction of the vertical section and so will cause the belt deviation.