Operation and Use of volumetric batching plant

How to use the volumetric batching plant correctly after successful installation? Let me introduce you to the detailed operation steps.

1) Close the main switch of the console, turn on the power supply and start the air compressor, so that the air pressure can reach 0.7 MPa.

2) Adjust the rotation and torsion of the rotary stirring time relay and set the stirring time.

3) Connect the main power supply, close the power switch of the console, and dial the power supply to the open position with the key.

4) Set up the concrete formula, pull the cement to choose the rotation and torsion to select the corresponding cement bin.

5) Press the concrete mixer to start the torsion and start the concrete mixer; put the hoist bucket of the concrete mixer into the pit.

6) Push the production mode on the panel of the console to twist and choose the working mode of the concrete mixing station. There are two working modes: (1) Manual working mode: Pull the working mode to the manual position, and the volumetric batching plant enters the manual working mode. Under this mode, aggregate proportioning, cement proportioning, water proportioning, admixture proportioning and aggregate proportioning machine discharging, hopper lifting and discharging. Dropping, cement scale, water scale, admixture scale and unloading of mixing machine are completed by the operator operating the press and twist on the control table. (2) Full-automatic working mode: the working mode is twisted to the automatic position, and the concrete mixing station enters the full-automatic working mode. Under this mode, the wet mix concrete batch plant automatically completes the whole process of concrete mixing according to the concrete formula and quantity input.

7) Emergency parking: If there is an emergency in the work of wet mix concrete batch plant, press the emergency stop button quickly, and the wet mix plant will stop all work; after troubleshooting, press the button again to resume work.