Concrete batching plants installation details will have a big impact on its smooth installation.
In the process of the operation of the concrete mixing plant to strictly abide by the use of various safety rules, operating personnel cannot do STH without authorization changes computer software program, can’t literally timing and constant pressure on the parameters of the machine operation, also can’t take other software installed on the machine to the work on the machine.If abnormal, should undertake by the specialized staff to maintenance.
First of all, before batch plant installing the use warehouse top filter need to be tested, including stress testing, pressure testing of imports and exports, flue gas temperature testing, the indicators to achieve optimal for use;
Second before the switch on, switch in the transformer room to check clear, to determine the presence of electricity leakage occurs, at this time, keep the dust catcher is in standby state, waiting for inspection to finish everything in place, on the whole batching plant machine;
Finally, the concrete mixing plant must pay attention to the presence of abnormal phenomenon in the process of open operation, such as: high temperature, noise, etc.If all is no problem, turn to human interface for inspection, see if everything is ok.