The main components of the concrete batching plant are installed

How to install the main components of the concrete batching plant ?

The mixing host, mixing host is the core of the concrete batching plant configuration: the concrete mixer under the plane under the appropriate pad height, with the hinge will be connected with the main shaft, equipment, cement scale, water scale, additive scale in the future, you can lift, And adjust the host chassis, so that in the horizontal situation, the center line of the legs and the center line after the center line can be filled with anchor bolts in the pit.

The mixing host and cement warehouse equipment after the end of the equipment can be screw conveyor, before lifting, check the lubrication point filling oil and grease, to be empty operation test, found that the problem in a timely manner, some of the equipment, The large batching machine is placed on a solid foundation pier can be placed on the plane, large batching machine plead to pour the anchor bolts, the machinery of some equipment after the end of all the equipment to check all the lubrication points filled with lubricating oil or Grease, you can according to the instructions and electrical schematics of the request wiring and empty operation test.

The silo of the cement warehouse is poured into the foundation pit. After adjusting the center line of the cement silo bracket and the center line of the base, the above four flanges can be adjusted on the same horizontal plane to select the concrete pouring. Pre-pit pouring concrete trademark should be higher than the base of concrete used in the winter construction, in order to shorten the duration, the use of concrete should be added early antifreeze.