The time is always too fast, inadvertently passed, now is the Autumn, the weather gradually cooler, the footsteps of Winter is also closer from us, where the professional batching plant manufacturer warmly remind you that in cold weather, especially in the Winter, pay attention to the maintenance of concrete batching plant, so that it can run normally, does not affect your production.
After the operation of the concrete batching plant, the operator after the day of work is the need for the equipment inside the mixing tank wall fouling, unloading mouth, mixing shaft and unloading the door on the residue to clean the work, you can use water rinse these parts of the equipment, if necessary, can be put into a small amount of stones and water mixing, after 10 minutes to release. Water washing car, additive tank and its supply system. These are required for the forced concrete mixer to run every day afterwards.
In the winter, the work that needs to be done after the end of the operation of the batching plant equipment is to drop the water and the residue inside the pump, the additive pump, the water tank, the additive tank, so that in the cold season the damage to the pump and its piping, Also need to start the pump of the additive pump running for about a minute, is the winter concrete mixing station maintenance of the road. Concrete mixing plant in the winter if not working, then each instrument construction equipment need to boot twice a week, and each boot time takes half an hour. This can prevent the concrete mixing plant in the winter long-term use does not cause frostbite, or boot can not start the phenomenon.